INSTALLATION INSTRUCTIONS
A f f i n i t y 3 0 G e
Evo, Inc. | 8140 SW Nimbus Ave., Bldg 5 | Beaverton, Oregon 97008 USA
Phone 503.626.1802 | Fax 503.213.5869 | www.evoamerica.com | [email protected]
13
1916"
40mm
1316"
30mm
2734"
704.85mm
7.65in
194.36mm
Shelving or
drawers can
be installed
under Affi nity
30Ge if
desired.
FRONT VIEW
STEP 3:
Construct a bay for the Evo unit with your chosen cabinet system. Position and
fasten the supplied mounting brackets 7.65” below the fi nished countertop surface.
Metal right angle mounting brackets supplied with unit are
each 1/16” thick. Mount angle brackets as shown. Unit
slides into framework and rests on top side of brackets.
Brackets are slotted for fasteners at each four corners.
Cabinet
Framework
Example: Tiled countertop with substrate.
Finished countertop thickness should be
3 cm.
COUNTERTOP INSTALLATION (4 of 4)