5 Assembly
NOTICE!
If climbing on the AHU is absolutely necessary during assembly, for example, for
connecting the roof plates, appropriate measures must be put in place. For exam-
ple, using boards, that the weight is distributed evenly, in order to avoid bending
or denting of the roof panels.
Figure 41:
Do not climb on the AHU!
5.1 Assembly of casing
5.1.1 Actions before the assembly of casing
If several AHU sections must be connected, then the procedure after the pre-positioning of the sec-
tions is as follows:
Remove crane lugs
If lifting lugs are mounted, remove them. To set the AHU in the exact assembling position, it can be
moved by a rod (leverage). Use the rod only on the base frame profile.
Applying sealing material
The supplied self-adhesive sealing strip (
) must be applied at all section connections
Following section connection points must be sealed:
-
The flange areas between sections.
-
Between duct and casing connection openings.
-
Between connection flange and dampers, flexible connection, weather protection grid, sand
trap louvre, intake hoods etc.
Figure 42:
Sealing strip
Figure 43:
Applying the sealing strip