Instruction Manual ZHK
V07-21.0
53/140
After assembling the entire sealing implementation has to be checked for durability and robust-
ness.
Figure 94:
Sealing of the base frame cover
At AHUs in outdoor execution, an additional separation bar (included in the scope of delivery) must
be mounted at the separation positions at the roof flange, see
Figure 95:
Mounting of the sliding bar
Figure 96:
Applying the sealing agent on the frontal joints
5
1
2
4
3
AHU flange
Roof flange
Содержание ZHK
Страница 1: ...ZHK INSTRUCTION MANUAL...