
E-S 500 / 502 Classic Series Instruction Manual
Installation of Operator —Pull-to-Open
2.4
1) Locate the set back template found in the
box to determine the proper setback. Create
a template out of the boomerang bracket by
tracing it on a piece of cardboard.
2) Find the proper setback for your operator
(from previous page). Hold the lower “L”
shaped bracket along with the boomerang
bracket template against the post near the
hinge. [
See Fig. 1
]
Mark how much of the boomerang bracket
you will trim off on the template.
The hole on
the end of the boomerang bracket should be
in the setback position.
NOTE:
The “L” shape brackets in our illustrations
are on the opposite side of the post as the
hinges. The “L” shape brackets in your situation
may be on the rear face of the post, this will be
determined by the relation of the setback to
the hinge location of your gate.
3) Trim boomerang bracket template, then
double check setback positioning.
Using the template, mark the boomerang
bracket for cutting. [
See Fig. 2
]
4) Cut off the excess length (if any) of the
boomerang bracket using a sawzall or hack-
saw.
Fig 1
Fig 2
Alternate Mounting Option
Содержание E-S 500
Страница 4: ...E S 500 502 Classic Series Instruction Manual SECTION 1 Review of Specifications Warnings and Tools ...
Страница 5: ......
Страница 10: ...E S 500 502 Classic Series Instruction Manual SECTION 2 Installation of Mounting Brackets ...
Страница 11: ......
Страница 25: ...E S 500 502 Classic Series Instruction Manual SECTION 3 Gate Operator Mounting Wiring Motors Power ...
Страница 26: ......
Страница 36: ...E S 500 502 Classic Series Instruction Manual SECTION 4 Start Up and Operation ...
Страница 37: ......
Страница 44: ...E S 500 502 Classic Series Instruction Manual SECTION 5 Maintenance Troubleshooting Accessories ...
Страница 45: ......