55
CS - 6,4 (1/4)
5,1 (200) 9,6 (3/8)
9,6 (3/8)
153
4,48 (65)
CS - 9,6 (3/8)
3,17 (125) 9,6 (3/8)
9,6 (3/8)
161
4,48 (65)
CS - 12,7 (1/2) 3,4 (95)
9,6 (3/8)
9,6 (3/8)
163
4,48 (65)
CS – 19,1 (3/4) 1,65 (65) 12,7 (1/2)
6,4 (1/4)
165
4,48 (65)
CS - 25,4 (1.0) 0,89 (35) 12,7 (1/2)
9,6 (3/8)
180
4,48 (65)
CS - 31,7 (1-1/4) 0,64 (25) NR
9,6 (3/8)
182
2,07 (30)
CS – 38,1 (1-1/2) 0,38 (15) NR
9,6 (3/8)
189
2,07 (30)
CS - 50,8 (2.0) 0,15 (6)
NR
9,6 (3/8)
211
2,07 (30)
SS - 6,4 (1/4)
5,33 (210) 9,6 (3/8)
9,6 (3/8)
164
4,48 (65)
SS - 9,6 (3/8)
3,94 (155) 9,6 (3/8)
9,6 (3/8)
166
4,48 (65)
SS - 12,7 (1/2)
2,8 (110) 9,6 (3/8)
9,6 (3/8)
170
4,48 (65)
SS – 19,1 (3/4) 1,4 (55)
12,7 (1/2)
9,6 (3/8)
174
4,48 (65)
SS - 25,4 (1.0) 0,64 (25) 12,7 (1/2)
9,6 (3/8)
181
4,48 (65)
SS - 31,7 (1-1/4) 0,38 (15) NR
9,6 (3/8)
187
2,07 (30)
SS – 38,1 (1-1/2) 0,25 (10) NR
9,6 (3/8)
194
2,07 (30)
AL - 6,4 (1/4)
5,33 (210) 9,6 (3/8)
9,6 (3/8)
171
5,86 (85)
AL - 9,6 (3/8)
3,94 (155) 9,6 (3/8)
9,6 (3/8)
179
4,48 (65)
AL - 12,7 (1/2) 2,8 (110) 9,6 (3/8)
9,6 (3/8)
182
4,48 (65)
AL – 19,1 (3/4) 1,65 (65) 9,6 (3/8)
9,6 (3/8)
187
4,48 (65)
AL - 25,4 (1.0) 1,0 (40)
9,6 (3/8)
9,6 (3/8)
189
5,86 (85)
AL - 31,7 (1-1/4) 0,50 (20) NR
9,6 (3/8)
193
2,07 (30)
AL – 38,1 (1-1/2) 0,35 (14) NR
9,6 (3/8)
197
2,07 (30)
seCtIon 4
operatIon
4.4.6 Maximum economy Conditions
The conditions outlined in the following tables will minimize the operating cost for common metals:
•
Use AIR as PLASMA and SHIELD GAS.
•
Achieve maximum cutting speed without regard to cut quality.
Pilot Arc - HIGH
Current - 200 Amps
Start Gas - AIR @ 25 psig
Plasma Gas - Air @ 45 psig (3.1 bar) for CS, 50 psig (3.5 bar) for SS & Al
Shield Gas - AIR (See Table)
See Torch manual for appropriate consumable part numbers.
Material
type-thickness
in.(mm)
speed
ipm(M/m
shield air
psi(bar)
piercing
in.(mm)
arc
Voltage
standoff
Cutting
in.(mm)
Содержание ESP-200
Страница 1: ...ESP 200 Plasmarc Cutting System Instruction Manual F15 462 C 02 2008 ...
Страница 12: ...12 section 2 description ...
Страница 31: ...31 section 3 installation Plumbing box fully connected including setup pendant ...
Страница 32: ...32 CE 1 2 3 4 5 6 7 9 10 11 12 13 16 19 20 21 22 15 17 18 14 section 3 installation 8 ...
Страница 78: ...78 section 7 replacement parts 7 3 ESP 200 P N 36324 Outside View Front 1 2 3 4 5 6 7 8 9 10 11 12 ...
Страница 80: ...80 section 7 replacement parts 7 4 Outside View Back CE 1 2 3 4 5 6 7 8 9 10 11 CE Unit Only 12 13 ...
Страница 84: ...84 section 7 replacement parts 1 2 3 4 5 6 7 8 9 10 11 12 13 7 6 Right Inside View ...
Страница 88: ...88 section 7 replacement parts 6 1 4 5 6 R ef R ef 2 3 7 8 Back and Top Inside View ...
Страница 92: ...92 section 7 replacement parts 1 2 3 4 5 6 7 8 7 10 Remote Setup Pendant P N 37145 ...
Страница 100: ...100 notes ...