SmartEdge 600 Router Hardware Guide
•
The cards that can be tested depend on the release of the software. In the
current release, you can test the following cards:
0
Controller cards (any version), when they are functioning as standby
controllers
0
ATM OC cards
0
10/100 Ethernet and Fast Ethernet–Gigabit Ethernet (FE–GE) cards
0
Transceiver-based Gigabit Ethernet cards (all versions)
0
POS OC cards
0
Advanced Services Engine
0
Note:
You cannot run ODD tests on the active controller card.
•
Low-density versions of line cards are also supported, but only the enabled
ports are tested.
Four levels of tests are supported; not all cards support all levels of tests.
Table 68
ODD Tests
Level
Components
Tests
1
All
Duplicates the tests of the power-on diagnostics; runs in 5 to 10 seconds.
2
Standby controller card, line cards only
Includes level 1 tests; tests all onboard active components in the line interface
module (LIM) of the board, including memory, registers, PPA DIMMs and
SRAM, PPA and other onboard processors; runs in 5 to 10 minutes.
3
Line cards only
Includes level 2 tests; tests and verifies the card data paths for the entire card
with internal loopbacks; runs in 10 to 15 minutes.
4
Line cards only
Includes level 3 tests; tests the entire card using external loopbacks; must be
run on site with external loopback cables installed; runs in 10 to 15 minutes.
A session log stores the latest results for each card in main memory and also on
the internal-storage device for low-level software; a history file stores the results
for each session for the last 100 sessions on that internal-storage device.
You can display partial test results while the tests are in progress; a notification
message is displayed when the session is completed. To view the results, use
the
show diag
command with the
on-demand
keyword in any mode. You
can display the latest results for a card from the log or the results for one or
more sessions from the history file.
If you are connected to the system using the Ethernet management port, you
must enter the
terminal monitor
command (in exec mode) before you
start the test session so that the system displays the completion message.
For more information about the
terminal monitor command
, see related
documentation at https://ebusiness.ericsson.net.
82
27/153 30-CRA 119 1170/1 Uen A
|
2010-04-09
Содержание SmartEdge 600
Страница 1: ...SmartEdge 600 Router Hardware Guide Release 6 3 INSTALLATION 27 153 30 CRA 119 1170 1 Uen A ...
Страница 6: ...SmartEdge 600 Router Hardware Guide 27 153 30 CRA 119 1170 1 Uen A 2010 04 09 ...
Страница 26: ...SmartEdge 600 Router Hardware Guide 20 27 153 30 CRA 119 1170 1 Uen A 2010 04 09 ...
Страница 108: ...SmartEdge 600 Router Hardware Guide 102 27 153 30 CRA 119 1170 1 Uen A 2010 04 09 ...
Страница 112: ...SmartEdge 600 Router Hardware Guide 106 27 153 30 CRA 119 1170 1 Uen A 2010 04 09 ...