SmartEdge 600 Router Hardware Guide
Install AC power modules in the shelf:
1.
Open the front ejector (fan cover) of the power module by squeezing the
latch spring and pulling open the ejector.
2.
Insert a module into one of the two center slots (2 and 3) in the shelf.
Note:
AC power modules operate only from the two center slots of the
AC power shelf.
3.
Push the module in until the right side of the ejector engages the receptacle
slot in the shelf wall.
4.
Push closed the ejector lever until the module spring latch locks on the
ejector to seat the module.
5.
Insert the second module into the other center slot and repeat steps 3 and 4.
2.5.1.3
Connect the AC Power Shelf to the Chassis
Figure 10
AC Power Connections
Warning!
Do not connect the AC power cords to the building outlets until you have
completed the installation. If you connect the other end of the AC power cord to
a building outlet, you power on the system; there is no ON/OFF switch on the
AC power shelf.
Connect the shelf to the chassis:
30
27/153 30-CRA 119 1170/1 Uen A
|
2010-04-09
Содержание SmartEdge 600
Страница 1: ...SmartEdge 600 Router Hardware Guide Release 6 3 INSTALLATION 27 153 30 CRA 119 1170 1 Uen A ...
Страница 6: ...SmartEdge 600 Router Hardware Guide 27 153 30 CRA 119 1170 1 Uen A 2010 04 09 ...
Страница 26: ...SmartEdge 600 Router Hardware Guide 20 27 153 30 CRA 119 1170 1 Uen A 2010 04 09 ...
Страница 108: ...SmartEdge 600 Router Hardware Guide 102 27 153 30 CRA 119 1170 1 Uen A 2010 04 09 ...
Страница 112: ...SmartEdge 600 Router Hardware Guide 106 27 153 30 CRA 119 1170 1 Uen A 2010 04 09 ...