57
#
#
#
#
#
#
#
#
#
#
#
#
ADVANCED OPERATION - Special functions: Service functions
Service functions: #-button
B
If you press the #-button while in splicing mode you gain
access to yet another group of operations and parameters.
The following section outlines them in the order they come up
during editing. However, if you want a more precise overview
of the organization of these parameters, see the flow chart in
Appendix C.
Current test for hot core alignment: CURRENT TEST?
If you have chosen a program with hot core alignment as its process, the first question that
will come up when you press the button is whether you want to run the current test. The
current test is used to set the RTC CURRENT parameter, which is described on page 29. The
following outlines the procedure you must follow if you want to run the current test and store
the resulting value in a hot core alignment program.
#
1 Choose a program that uses the hot core alignment pro-
cess. Note that, though you can run the current test with the
pre-defined program 05, the resulting value can not be stored
in it, so it is best to copy it to another slot by following the
instructions on page 45.
2 Press the button.
3 Press the Yes button to say you want to run the current
test. You will subsequently have to answer No three times, in
order to reject the other operations available via the #-butto--
namely “Clean electrodes?” “Splicelist handling?” and “Enter
service mode?”
4 The splicer will then instruct you that in order to start the
current test, you must press the FUSE button.
5 The splicer will then run the current test, store the value
for RTC CURRENT, and carry out the splicing sequence to its
completion. If the splicer can not splice the tested fibers
(because they became damaged during the test), it will dis-
play the fault message “REPLACE FIBERS,” and you will
have to replace the fibers before splicing. If you run the test
using Program 05, the splicer can not save a value for RTC
CURRENT and will display “CHANGES NOT SAVED.”
MAX ECCENTRICITY
1.0 UM
RTC CURRENT
12.5 MA
ACCEPTABLE OFFSET
0.3 UM
ECCENTRIC TEST
HOT CORE ALIGNMENT
Example of a program with hot core alignment
in the screen-viewer. The parameter values
have been copied from P05 into a new slot
and the program renamed.
#
#
To access current test
Yes
“
“
CURRENT TEST?
Choose current test
No
No
No
Reject other operations
Run current test
Fuse
“
“
TESTING CURRENT...
○○
“
“
SPLICING...
○○
Содержание FSU 995 F
Страница 1: ...Established 1981 Advanced Test Equipment Rentals www atecorp com 800 404 ATEC 2832...
Страница 2: ...FSU 995 FA User s manual 133ST010R1A...
Страница 3: ...1 User s manual for the FSU 995 FA single fiber fusion splicer by Ericsson...
Страница 4: ...2...
Страница 26: ...24...
Страница 85: ...83...