WorkForce 1100/Epson Stylus Office T1110/B1100/T1100/Epson ME Office 1100
Revision C
Disassembly And Assembly
Disassembling the Printer Mechanism
90
Confidential
8. Remove CR Shaft Mounting Plate Fixed Spring from the tab and notch on the
Main Frame, and pull out the spring in the direction of the arrow.
Figure 4-62. Removing CR Shaft Mounting Plate Fixed Spring
9. Remove the extension spring for the Driven Pulley Holder from the Main Frame
and the tab on the Drive Pulley Holder with needle-nose pliers.
Figure 4-63. Removing the Extension Spring for the Driven Pulley Holder
10. Slide Driven Pulley Holder to the right end of the notch on the Main Frame, and
Remove the Driven Pulley Holder toward you.
Figure 4-64. Removing the Driven Pulley Holder
Place the feet of Left PG Torsion Spring and Right PG Torsion
Spring on the Carriage Shaft.
Figure 4-61. Reinstalling PG Torsion Springs
Insert the foot of CR Shaft Mounting Plate Fixed Spring into the
notch on the Main Frame (rear side). (
See Figure 4-62 (p.90)
)
Foot
Left Side
Foot
Right Side
Tab
CR Shaft Mounting Plate Fixed Spring
Notch
Notch (rear side)
Tabs
Extension spring for the
Driven Pulley Holder
Driven Pulley Holder
Driven Pulley
Driven Pulley Holder
Содержание WorkForce 1100
Страница 8: ...Confidential C H A P T E R 1 PRODUCTDESCRIPTION ...
Страница 21: ...Confidential C H A P T E R 2 OPERATINGPRINCIPLES ...
Страница 29: ...Confidential C H A P T E R 3 TROUBLESHOOTING ...
Страница 61: ...Confidential C H A P T E R 4 DISASSEMBLYANDASSEMBLY ...
Страница 128: ...Confidential C H A P T E R 5 ADJUSTMENT ...
Страница 152: ...Confidential C H A P T E R 6 MAINTENANCE ...
Страница 162: ...Confidential C H A P T E R 7 APPENDIX ...