WorkForce 1100/Epson Stylus Office T1110/B1100/T1100/Epson ME Office 1100
Revision C
Disassembly And Assembly
Removing the Boards
75
Confidential
4.3 Removing the Boards
4.3.1 Board Assy (Main Board/Power Supply Board)
1.
Remove the Upper Housing / Printer Cover. (p.72)
2. Remove the seven screws (four C.B.S. M3 x 6, two C.B.S. (P2) M3 x 8, and one
C.B.S. M3 x 8) that secure the Board Assy.
Figure 4-20. Removing the Board Assy (1)
3. Disconnect all the cables and FFCs connected on the Main Board from the near
side one by one.
Figure 4-21. Connector Layout of the Main Board (130 Digit Side)
Tighten the screws in the order shown in
Figure 4-20
.
Board Assy
2
5
6
15) C.B.S. (P2) M3x8
(6±1 kgf.cm)
1
3
4
7
5) C.B.S. M3x8
(6±1 kgf.cm)
2) C.B.S. M3x6
(6±1 kgf.cm)
No.
Connector
No.
Connector
CN4
Panel Bard, Cover Open Sensor
CN22
CSIC
CN5
Relay FFC (for sensor)
CN115
CR Motor
CN9
CR Encoder Sensor, PW Sensor
CN116
PF Motor
CN11
CR Relay Board
CN117
Pump Motor
CN12
CR Relay Board
CN118
APG Motor
CN13
CR Relay Board
CN119
ASF Motor
CN116
CN5
CN4
CN12
CN118
CN117
CN13
CN19
CN11
CN15
CN22
CN9
Содержание WorkForce 1100
Страница 8: ...Confidential C H A P T E R 1 PRODUCTDESCRIPTION ...
Страница 21: ...Confidential C H A P T E R 2 OPERATINGPRINCIPLES ...
Страница 29: ...Confidential C H A P T E R 3 TROUBLESHOOTING ...
Страница 61: ...Confidential C H A P T E R 4 DISASSEMBLYANDASSEMBLY ...
Страница 128: ...Confidential C H A P T E R 5 ADJUSTMENT ...
Страница 152: ...Confidential C H A P T E R 6 MAINTENANCE ...
Страница 162: ...Confidential C H A P T E R 7 APPENDIX ...