WorkForce 1100/Epson Stylus Office T1110/B1100/T1100/Epson ME Office 1100
Revision C
Disassembly And Assembly
Disassembling the Printer Mechanism
83
Confidential
8. Disconnect all the FFCs connected on the CR Relay Board.
CN1: Printhead
CN2: Printhead
CN3: Main Board
CN4: Main Board
Figure 4-42. Removing the CSIC Assy (2)
9. Remove the C.B.S. M3 x 6 screw that secure the CR Relay Board, and remove the
CR Relay Board from the Carriage Unit.
Figure 4-43. Removing the CSIC Assy (3)
10. Release the two hooks; located on both the left side and the right side of the CSIC
Assy, and remove the CSIC Assy upward.
Figure 4-44. Removing the CSIC Assy (4)
CN3
CN1
CN2
CN4
CR Relay Board
2) C.B.S. M3x6
(6±1 kgf.cm)
Hook
Hook
CSIC Assy
Hook
Hook
CSIC Assy
Содержание WorkForce 1100
Страница 8: ...Confidential C H A P T E R 1 PRODUCTDESCRIPTION ...
Страница 21: ...Confidential C H A P T E R 2 OPERATINGPRINCIPLES ...
Страница 29: ...Confidential C H A P T E R 3 TROUBLESHOOTING ...
Страница 61: ...Confidential C H A P T E R 4 DISASSEMBLYANDASSEMBLY ...
Страница 128: ...Confidential C H A P T E R 5 ADJUSTMENT ...
Страница 152: ...Confidential C H A P T E R 6 MAINTENANCE ...
Страница 162: ...Confidential C H A P T E R 7 APPENDIX ...