Maintenance
9. Joint #1
174
VT Rev.1
Joint #1
Timing Belt
Installation
(1) Pass the following cables through a new Joint #1 timing belt.
Power cable
Signal cable (for motor)
LED cable
Ground wire
(2) Mount the Joint #1 motor unit.
Reference:
Maintenance 9.1 Replacing Joint #1 Motor
Joint #1 Motor Installation (2) through (8)
(3) Connect the ground wire terminals
inside the base.
Cross recessed head screws:
M4
×
6
Tightening torque: 2.0
±
0.1N m
(4) Pass the wire tie through the hole on
the plate inside the base.
Bind the following cables with the
wire tie.
Wire tie: AB150
Power cable
LED cable
Signal cable (for motor)
Ground wire
(5) Connect the following connectors to
the controller unit.
A: Power cable connector
B: Signal cable connector
C: Hand I/O connector
D: LED connectors
×
2
D A
C
B
D
Содержание VT Series
Страница 1: ...6 Axis Robots VT series MANIPULATOR MANUAL Rev 1 EM18YR3817F ...
Страница 2: ...MANIPULATOR MANUAL VT series Rev 1 ...
Страница 8: ...vi VT Rev 1 ...
Страница 16: ...TABLE OF CONTENTS xiv VT Rev 1 ...
Страница 18: ......
Страница 31: ...Setup Operation 2 Specifications VT Rev 1 15 2 4 Outer Dimensions ...
Страница 32: ...Setup Operation 2 Specifications 16 VT Rev 1 Unit mm ...
Страница 33: ...Setup Operation 2 Specifications VT Rev 1 17 2 5 Standard Motion Range Unit mm ...
Страница 129: ...Maintenance This volume contains maintenance procedures with safety precautions for VT series Manipulators ...
Страница 130: ......
Страница 138: ...Maintenance 3 Manipulator Structure 122 VT Rev 1 3 Manipulator Structure ...