Maintenance 11. Joint #3
VT Rev.1
189
Joint #3 Motor
Installation
(1) Fix the AMP board fixing plate (with AMP board) to a new
motor unit.
Hexagon socket head cap bolts: 2-M3×6
Tightening torque: 2.0 ± 0.1 N
·
m
(2) Connect the following connectors of the motor.
A: Signal cable connectors (for motor
×
2)
B: Signal cable connector (for AMP board)
Connector for the signal cable connector (for motor) is the
same color.
A
B
(3) Connect the connectors of the AMP board.
A: Power cable connector
B: Brake connector
C Signal cable connector (for AMP board)
D: Motor connector
A
B
D
C
(4) Attach the thermal sheet on the bottom of the motor unit.
For the attaching position, refer to the picture on the right.
Match the corners
Make sure that the entire surface of the thermal sheet
contacts with the rear side of the motor unit without lifting
up the center of the sheet.
Wrong
Correct
NOTE
NOTE
Содержание VT Series
Страница 1: ...6 Axis Robots VT series MANIPULATOR MANUAL Rev 1 EM18YR3817F ...
Страница 2: ...MANIPULATOR MANUAL VT series Rev 1 ...
Страница 8: ...vi VT Rev 1 ...
Страница 16: ...TABLE OF CONTENTS xiv VT Rev 1 ...
Страница 18: ......
Страница 31: ...Setup Operation 2 Specifications VT Rev 1 15 2 4 Outer Dimensions ...
Страница 32: ...Setup Operation 2 Specifications 16 VT Rev 1 Unit mm ...
Страница 33: ...Setup Operation 2 Specifications VT Rev 1 17 2 5 Standard Motion Range Unit mm ...
Страница 129: ...Maintenance This volume contains maintenance procedures with safety precautions for VT series Manipulators ...
Страница 130: ......
Страница 138: ...Maintenance 3 Manipulator Structure 122 VT Rev 1 3 Manipulator Structure ...