9. Joint #1
VT Rev.1
169
(6) Apply proper tension to the motor unit and fix it.
Joint #1 timing belt tension: 34
∼
70 N
Belt tension meter setting values
Weight: 2.5g/mm width×m span
Width: 9.0mm
Span: 60mm
Hexagon socket head cap bolts: 3-M4×22 (with slotted hole washer)
Tightening torque: 4.0 ± 0.2 N·m
Regarding belt tension:
Jumping (position gap) may occur if the value is below the lower limit.
Vibration (abnormal noise) or reduction in life of the parts may occur if the value
exceeds the upper limit.
When you replace with a new belt, belt extends and the belt tension may decrease in
the initial stage. Make sure to operate the robot two to three days and check the belt
tension again.
(7) Mount the plate of the Arm #1 sleeve side.
Hexagon socket head cap bolts: 2-M4
×
12 (with a washer)
Tightening torque: 4.0
±
0.2 N·m
Pass the wire tie through the hole on the plate.
Bind the following cables and the ground wire with the wire
tie.
Motor cable
Signal cable (for motor)
LED cable
Ground wire
(8) Bind the following cables between the Joint #1 motor and the
controller unit with the wire tie.
Wire tie: AB100
Signal cable (for motor)
Signal cable (for AMP board)
(9) Mount the Arm #1 cover.
Reference:
Maintenance 7.1 Arm #1 Cover
(10)
Turn ON the Manipulator.
Reference:
Setup & Operation 6.5 LED
When starting the manipulator for the first time after replacing the motor unit, the
motor unit firmware is automatically updated. DO NOT turn OFF the manipulator
until it starts.
(11) Calibrate the Joint #1.
Reference:
Maintenance 19. Calibration
NOTE
NOTE
Содержание VT Series
Страница 1: ...6 Axis Robots VT series MANIPULATOR MANUAL Rev 1 EM18YR3817F ...
Страница 2: ...MANIPULATOR MANUAL VT series Rev 1 ...
Страница 8: ...vi VT Rev 1 ...
Страница 16: ...TABLE OF CONTENTS xiv VT Rev 1 ...
Страница 18: ......
Страница 31: ...Setup Operation 2 Specifications VT Rev 1 15 2 4 Outer Dimensions ...
Страница 32: ...Setup Operation 2 Specifications 16 VT Rev 1 Unit mm ...
Страница 33: ...Setup Operation 2 Specifications VT Rev 1 17 2 5 Standard Motion Range Unit mm ...
Страница 129: ...Maintenance This volume contains maintenance procedures with safety precautions for VT series Manipulators ...
Страница 130: ......
Страница 138: ...Maintenance 3 Manipulator Structure 122 VT Rev 1 3 Manipulator Structure ...