13
www.enelx.com
Phone: +1-844-584-2329
1. Open crate
Move the crate as close to the
prepared installation site as possible.
Ensure there is enough room to
manoeuvre the lifting apparatus.
Remove/slide out all crate tubes to
disassemble the cardboard crate.
2. Lift Veefil-RT to vertical
Securely attach the lifting straps at the
top of the JuicePump to the lifting appa
-
ratus and gently raise to a standing posi
-
tion on the shipping baseplate.
The JuicePump must remain attached to
the lifting equipment until the mounting
bolts have been installed.
NOTE: The JuicePump is 2050mm/6.72ft
tall on the shipping baseplate.
Do not use the plug holders to assist
lifting the charger at any stage.
Once upright remove all wrapping.
Lifting Straps
Shipping
Baseplate
Unpacking & installation preparation