![Enel X JuicePump Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/enel-x/juicepump/juicepump_installation-manual_2408780014.webp)
11
www.enelx.com
Phone: +1-844-584-2329
Installation requirements & equipment
These instructions provide a systematic
guide for installing and commissioning
the JuicePump.
The JuicePump must be installed and
serviced by qualified electrical personnel.
Observe all pertinent national, regional,
and local safety regulations when you
install and commission the JuicePump.
The JuicePump has a NEMA Type 3R
electronics enclosure rating, however, as
it must be opened for installation, this is
best done in dry weather or under
cover to avoid moisture or debris ingress.
Installation shall not be done in a
commercial garage (repair facility) or
closer than 6 meters/20ft of an outdoor
motor fuel dispensing device.
The JuicePump must be properly in
-
stalled, assembled and commissioned
according to these instructions before it is
used.
Prior to installation contact your supplier
to organise commissioning information.
Supplied with JuicePump:
5mm pin hex tool to remove the M8
security screws fixing the plastic panels.
2.5mm hex ‘L’ wrench
Lifting straps
Blanking plugs are fitted for transport and
storage.
Flexa conduit system
Black ferrite ring ID13x40mm
Black ferrite ring ID25x43mm
Grey ferrite ring
Baseplate template
The JuicePump is shipped with a tem
-
porary single phase power cable which
allows the unit to be powered prior to
installation.
This allows for software updates,
charger configuration and/or 4G
connectivity testing. The cable has a male
IEC socket and an IEC female lead is
required to supply power.
If pre installation power up is required
contact your supplier prior to the
installation date to synchronize with
Enel X.
Содержание JuicePump
Страница 1: ...50kW DC RT www enelx com Phone 1 844 584 2329 Installation Manual TRI93 50 01 UL ...
Страница 2: ......