22
www.enelx.com
Phone: +1-844-584-2329
Bend the wires to the side of the ferrite
rings and up into the connection points.
Check that the wiring is sitting behind the
lower face of the switch gear so they will
not interfere with the service cover.
Tightening Torque:
Breaker
4.0 Nm/35 lb-in
Check the breaker terminals are tightened
to the above settings.
Trim the wires leaving a minimum of
300mm/12 inches exposed.
Single phase wires thread through the
small black ferrite (1) only.
Three phase brown, orange, yellow, and
green/yellow ground wiring thread firstly
through the large grey ferrite (2).
Three phase brown, orange, yellow only
thread through the large black ferrite
(3).
Wire & commission
Содержание JuicePump
Страница 1: ...50kW DC RT www enelx com Phone 1 844 584 2329 Installation Manual TRI93 50 01 UL ...
Страница 2: ......