Turbimax CUE21 / CUE22
Installation
Hauser
9
4.1.2
Mounting dimensions
OUT
OUT
IN
E
200 (8)
M6 (¼)
207.7
(8.18)
90.2 (35)
50.8 (2.0)
M4
(3/16)
30.2
(1.19)
147.7 (5.81)
87.3 (3.44)
A0025606
2
Mounting dimensions - front view
131.6 (5.16)
347.2 (13.7)
196.8 (7.75)
61.8
(2.43)
A0025608
3
Mounting dimensions - lateral view
Dimensions in mm (inch)
4.2
Mounting the measuring device
4.2.1
Wall mounting
The device is designed for wall mounting. If wall mounting is not practicable, the device
can be mounted on any suitable level surface.
• Ensure that the temperature does not exceed the maximum permitted operating
temperature range (0 to 50 °C (32 to 122 °F)).
• Leave approx. 20 cm (8 inch) of free space above the device to ensure that there is
sufficient room for calibration and cuvette maintenance.(→ 2)
• Mount the device as close as possible to the sampling point to ensure fast response times
(within 2 to 3 m (6 to 10 ft)).
1. Drill mounting holes for the M4 mounting screws to install the field terminal box.
2. Drill mounting holes for the M6 mounting screws to install the device housing on top
of the terminal box.
3. Mount the terminal box.
4. Mount the rest of the device on top of the terminal box.
4.2.2
Installing the desiccant pouch
The device is equipped with a continuous vapor purge system. A replaceable desiccant
pouch in the lower portion of the instrument dries the air. System heat is used to warm the
工程师电话(微信)15915717832
Содержание Turbimax CUE21
Страница 39: ...15915717832...
Страница 40: ...15915717832...