Turbimax CUE21 / CUE22
Electrical connection
Hauser
15
Electrical connection
Notes
Are all cable entries mounted, tightened and leak-tight?
For lateral cable entries, make sure the
cables loop downwards to allow water
to drip off
Are the PE distributor blocks grounded (if present)?
Grounding is carried out at the point of
installation.
工程师电话(微信)15915717832
Содержание Turbimax CUE21
Страница 39: ...15915717832...
Страница 40: ...15915717832...