Wiring
Smartec S CLD132/134 PROFIBUS-PA/-DP
10
Hauser
The remaining connection (sensor, power supply etc.) are described in the standard
Operating Instructions (BA00207C/07/EN for CLD132, BA00401C/07/EN for CLD134).
Bus termination
The bus terminations for PROFIBUS PA and DP are different.
Each PROFIBUS PA segment must be terminated with a
passive
bus termination on each
end.
Each PROFIBUS DP segment must be terminated with an
active
bus termination on each
end.
3.2
Post-connection check
After the electrical connection, carry out the following checks:
Device condition and specifications
Notes
Are the transmitter and cables damaged on the outside?
Visual inspection
Electrical connection
Notes
Are the mounted cables strain relieved?
Cable run without loops and cross-overs?
Are the signal lines correctly connected in accordance with the wiring
diagram?
Are all screw terminals tightened?
Are all cable entries installed, tightened and sealed?