Electrical connection
Proline Promag L 800
40
Hauser
A0016648
Fig. 23: Example of a battery arrangement (configuration 5)
B1
Battery connection to back up the power supply for the measuring device
B2
Battery connection to power the measuring device
B3
Battery connection to power the GSM/GPRS module
4.
Connect the batteries.
– Insert the battery cables into the appropriate receptacle
5.
Set the DIP switches
The following options are available:
– Set the DIP switch to ON to switch on the battery power supply.
If battery power supply is switched on, the red CPU LED flashes
54 and the startup
sequence appears on the onsite display
– Set the DIP switch to OFF to switch off the battery power supply.
A0017025
Fig. 24: Connecting the batteries, switching on the battery power supply
1
Cable inlet in the battery cover
2
Receptacles for terminals B1 and terminals B2 and B3
3
DIP switch (ON/OFF) for switching the batteries on and off:
- Switch 1: terminals B3
- Switch 2: terminals B1 and B2
4
DIP switch (ON/OFF) to disable the controls of the local display
B
1
B
2
B
3
1
B
2
B
1
B
3
B
1
B
2
B
3
O
N
12
B
1
/B
2
O
N
B
3
O
N
12
1
7
16
15
1
4
10
9
8
7
6
5
13
12
11
4
3
2
1
L
OCK
C
P
U
G
S
M
2
B
1
B
2
B
3
3
O
N
12
B
1
/B
2
O
N
B
3
O
N
– OFF
B
3
B
1
/B
2
4
O
N
12
L
OCK
O
N
– OFF
Содержание Proline Promag L 800
Страница 55: ...Proline Promag L 800 Commissioning Endress Hauser 55...
Страница 56: ...www addresses endress com...