Figure 4-4: External ground lug
A. External ground lug
Figure 4-5: Internal ground lug
A. Internal ground lug
Important
Use the internal grounding terminal as the primary equipment ground. The external
terminal is only a supplemental bonding connection where local authorities permit or
require such a connection.
User manual
Prepare the turbine meter for use
P/N 3-9008-515
March 2019
User manual
65
Содержание Daniel Series
Страница 1: ...User manual P N 3 9008 515 Rev AF March 2019 Daniel Series 1500 Liquid Turbine Meter NPS 3 through 24 ...
Страница 2: ...2 ...
Страница 11: ...Part I Plan User manual Plan P N 3 9008 515 March 2019 User manual 11 ...
Страница 12: ...Plan User manual March 2019 P N 3 9008 515 12 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 69: ...Part II Install User manual Install P N 3 9008 515 March 2019 User manual 69 ...
Страница 70: ...Install User manual March 2019 P N 3 9008 515 70 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 78: ...Testing User manual March 2019 P N 3 9008 515 78 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 79: ...Part III Operate User manual Operate P N 3 9008 515 March 2019 User manual 79 ...
Страница 80: ...Operate User manual March 2019 P N 3 9008 515 80 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 83: ...Part IV Maintain User manual Maintain P N 3 9008 515 March 2019 User manual 83 ...
Страница 84: ...Maintain User manual March 2019 P N 3 9008 515 84 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 105: ...User manual P N 3 9008 515 March 2019 User manual 105 ...