7. Attach electrical output wiring from both pickoffs to terminal connection TB2 and
TB3.
8. Attach electrical output wiring from electrical accessories (conduit wiring) to
terminal connection TB1, number 3 for channel A, and number 5 for channel B.
9. Secure all electrical wiring.
10. Secure screws of preamplifier bracket in to the enclosure.
11. Return cover and secure.
9.8
Planned maintenance tasks
Table 9-2: Planned maintenance tasks
Task
Recommended action
Inspect
Implement a periodic inspection program to ensure all parts
are free from damage due to process, ambient or other
abnormal conditions.
•
Internal components: rotor, upstream to downstream
cone, etc.
•
Meter body housing, external flanges, flamepath.
•
Bolting
•
Electrical connections.
Clean
Use a non-toxic metal cleaning solvent.
Do not use common petrochemical solvents like Benzene,
Toluene or Xylene as they can pose potential health hazards.
Monitor corrosion / erosion / wear
A careful review of turbine meter proving history, such as
turbine meter factor control charts, can reveal potential
problems with turbine meter measurements. Examples
include bearing drag due to wear or an increased internal
cross-sectional area due to erosion.
Planned maintenance
User manual
March 2019
P/N 3-9008-515
98
Daniel Series 1500 Liquid Turbine Meter, NPS 3-24
Содержание Daniel Series
Страница 1: ...User manual P N 3 9008 515 Rev AF March 2019 Daniel Series 1500 Liquid Turbine Meter NPS 3 through 24 ...
Страница 2: ...2 ...
Страница 11: ...Part I Plan User manual Plan P N 3 9008 515 March 2019 User manual 11 ...
Страница 12: ...Plan User manual March 2019 P N 3 9008 515 12 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 69: ...Part II Install User manual Install P N 3 9008 515 March 2019 User manual 69 ...
Страница 70: ...Install User manual March 2019 P N 3 9008 515 70 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 78: ...Testing User manual March 2019 P N 3 9008 515 78 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 79: ...Part III Operate User manual Operate P N 3 9008 515 March 2019 User manual 79 ...
Страница 80: ...Operate User manual March 2019 P N 3 9008 515 80 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 83: ...Part IV Maintain User manual Maintain P N 3 9008 515 March 2019 User manual 83 ...
Страница 84: ...Maintain User manual March 2019 P N 3 9008 515 84 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 105: ...User manual P N 3 9008 515 March 2019 User manual 105 ...