Install - Step 2
Power up
1. Turn on the power switch for each standby power supply (SPS).
2. Turn on the master switch/circuit breakers for each cabinet/rack power strip.
The storage system can take 30 to 45 minutes to complete its first powerup. Amber
warning lights will flash during power on self-test (POST) and then go off.
The front fault light and the SPS recharge lights commonly stay on for several minutes while
the SPS units fully charge.
If any amber lights on the front or back of the storage system remain on for more
than 45 minutes, make sure the storage system is correctly cabled and then refer to
the CX3-series troubleshooting flowcharts on the Powerlink site. If you cannot
determine any reasons for errors, contact your authorized service provider.