25
www.elspec-ltd.com | December 2014 | SMX-0609-0101
User Manual | EQ-ST | V15
S
YSTEM
I
NITIALIZATION
System initialization comprises system programming and capacitor group tests. To program the system, use the
wizard, which will guide you through all the necessary steps. The system will automatically prompt you only for
those parameters, which apply to the specific system type and structure.
On completion of system programming, test each capacitor group in sequence as described under "Testing of
Other Groups" on Page 59.
P
REPARATION FOR
S
ITE
I
NSTALLATION
(1)
Switch
(2)
Connect fuses (or circuit breakers) of capacitor group 1 only. Note that it is a single set of three (3)
fuses and that they may not be positioned one near to the other. See drawings in the pocket of
this manual back cover or in the documents pouch inside the system for fuses location;
WARNING
Fuses should only be installed or removed after all power
sources are disconnected, locked and tagged out. In
addition, capacitors must be allowed ten (10) minutes to
discharge fully before commencing any work within the
enclosure.
(3)
Close and latch enclosure doors, then switch cabinet power ON;
(4)
F2 (Setup). Otherwise,
press F3 (Menu) and use F4 (
) and F5 (
F3
F4 (
) and F5 (
), and press F3 (Enter);
(5)
procedure;
!
Содержание EQUALIZER-ST
Страница 1: ...1 www elspec ltd com December 2014 SMX 0609 0101 User Manual EQ ST V16 16 ...
Страница 99: ...99 www elspec ltd com December 2014 SMX 0609 0101 User Manual EQ ST V15 3 PHASE DELTA CONFIGURATION ...
Страница 100: ...100 www elspec ltd com December 2014 SMX 0609 0101 User Manual EQ ST V15 ...
Страница 101: ...101 www elspec ltd com December 2014 SMX 0609 0101 User Manual EQ ST V15 SINGLE PHASE CONFIGURATION ...