The system has a terminal block for connecting both system and mains CTs (Figure 7). The terminal block includes
five sets of two shorting terminals with shorting bar each. The two system CTs are factory installed on system
input and three are field installed, remotely, on the service mains. Up to the moment when required for system
secondary circuits safely.
Figure 7: CT Connection Terminals
To connect, follow the procedure below:
(1)
ed 120% (or higher) the
maximum mains current. Recommended CTs have 0.5% accuracy, bandwidth of 4kHz and 10VA or
higher burden. Connect mains CTs to the output of the main circuit breaker and upstream of any
other load as may be connected on the mains bus bars (see Figure 8);
(2)
Connect 6×2.5 mm² wires between the mains CTs and the input terminals of the system CTs. Mark
the phases on both ends of each wire. The maximum distance between the mains CTs and the
input terminals depends on the maximum CTs allowed burden;
WARNING
Throughout installation, verify that all CTs terminals are
shorted at the system CTs terminal block.
Figure 8: Position of Mains Current Transformers
!
Mains CTs
Connection
Terminals, the
circuit is
shorted while
both terminals
are in “down”
position
System
Internal CTs
Connection
Terminals.
Содержание EQUALIZER-ST
Страница 1: ...1 www elspec ltd com December 2014 SMX 0609 0101 User Manual EQ ST V16 16 ...
Страница 99: ...99 www elspec ltd com December 2014 SMX 0609 0101 User Manual EQ ST V15 3 PHASE DELTA CONFIGURATION ...
Страница 100: ...100 www elspec ltd com December 2014 SMX 0609 0101 User Manual EQ ST V15 ...
Страница 101: ...101 www elspec ltd com December 2014 SMX 0609 0101 User Manual EQ ST V15 SINGLE PHASE CONFIGURATION ...