Chapter 5.
To start the system up, follow the procedure below:
(1)
no voltage is
present in the system cabinet;
WARNING
Before any work is performed inside the system, ensure that
all power sources are disconnected, locked and tagged out.
In addition, capacitors must be allowed ten (10) minutes to
discharge fully.
(2)
Disconnect all internal fuses and circuit breakers;
Using an ohmmeter, check the resistance between all phases (L1-L2, L2-L3, L3-L1) and between all phases
to neutral (if exists in the system) and to ground (L1-G, L2-G, L3-G and in WYE network also L1-N, L2-N and
L3-N) to ensure that they are not shorted. Resistance should be minimum 100 M
(Mega Ohms);
(3)
Connect the main control switch circuit breaker and all the control fuses;
lights up and that the display shows a stable reading;
(4)
Use F4 (
) and F5 (
) to check phase-to-phase (L-L) voltages, as well as frequency readings for all
three phases, to obtain valid and stable readings. In WYE network configuration check also the
phase to neutral (L-N) voltages;
!
Содержание EQUALIZER-ST
Страница 1: ...1 www elspec ltd com December 2014 SMX 0609 0101 User Manual EQ ST V16 16 ...
Страница 99: ...99 www elspec ltd com December 2014 SMX 0609 0101 User Manual EQ ST V15 3 PHASE DELTA CONFIGURATION ...
Страница 100: ...100 www elspec ltd com December 2014 SMX 0609 0101 User Manual EQ ST V15 ...
Страница 101: ...101 www elspec ltd com December 2014 SMX 0609 0101 User Manual EQ ST V15 SINGLE PHASE CONFIGURATION ...