GLAZING THE STRUCTURE
Having anchored the structure to the wall and its base, observing the earlier comments about levels,
square etc. you can commence glazing.
If you are out on any of the 4 key points i.e.
1. Plumb wall
2. Level base
3. Square base
4. Base set at 90º to wall
then you will have difficulty in glazing. So please be sure before starting this section of construc-
tion.
TOUGHENED GLASS
The toughened glass is in single sheets, apart from the shapes.
Where you have glass ’butt jointing together’ you use the PVC muntin as indi-
cated. If you have purchased the bar-capping, see separate capping instruction
to be found with the capping bundle.
N.B There are a small number of stainless steel wire clips which you use im-
mediately behind the door i.e. the section of glass that the door opens on to.
NB. If you have purchased PVC bar capping, the stainless steel band clips are
replaced by wire clips. See separate instruction packed with bar capping bundle.
The glass to fit along the front (under the gutter) is required to be longer
than the glass supplied. To overcome this, you will find a number of PVC
spacer bars inside the packet of glass delivered (full sheet toughened glass
only). This spacer must be fitted to the top of the front pane before the glass
is installed to the front assembly.
Starting with the roof glass (refer to glazing chart) slide the glass onto the roof
until the bottom edge sits in the recess on the gutter bar. Insert stainless steel
band/spring clip approx. 3” from the bottom of each side and then equidistance
along the length. (12 clips per pane on the roof glass, 10 per pane on the side
glass and 4 per small pane/shape).
Содержание TITAN K800
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 17: ...GENERALASSEMBLY OF GREENHOUSE UNIT...
Страница 24: ...DOOR FRAME ASSEMBLY...
Страница 36: ...ELITE 1512...