background image

  SILVERLINE LEAN TO

 

86,  106 

and 

126

 

86 Lean-To

 

126 Lean-To

 

Customer Service Department

 

Eden Halls Greenhouses Ltd. 

Tel. 01242 676625 Option 1 

[email protected]

 

30082013

 

Содержание Silverline 106 Lean-To

Страница 1: ...SILVERLINE LEAN TO 86 106 and 126 86Lean To 126Lean To Customer Service Department Eden Halls Greenhouses Ltd Tel 01242 676625 Option 1 mail eden greenhouses com 30082013...

Страница 2: ...that may scratch the acrylic Selecting a Site Choose a sunny spot for your greenhouse where it will receive a fair amount of sunlight Note that the ridge height of your greenhouse without the base is...

Страница 3: ...1106 No 6 x 16mm self tapping screws 1476 612 1774 5 1839 2...

Страница 4: ...1633 PLEASE NOTE PART 00649 IS A REDUNDANT ITEM THAT IS NO LONGER REQUIRED 3...

Страница 5: ...e than 30mm width should be made to fit the aluminium section as shown in fig 2a When the greenhouse has been assembled it can be screwed to the base with no 12 screws and rawlbolts not supplied throu...

Страница 6: ...PLEASE NOTE THE GREENHOUSE MAY BE SUPPLIED WITH EITHER SQUARE NUTS OR HEXAGONAL NUTS A B C E D 5...

Страница 7: ...ORTANT Remember to slide one bolt into the groove of each intermediate vertical bar that is crossed by a diagonal brace in order to fix the centre of that brace as in A The parts should be bolted with...

Страница 8: ...M J H G I K N F L F 7...

Страница 9: ...in F Note that the plain side of the corner post should face inside the greenhouse and the bolt head on the outside Bolt the end sill bar 756 to the corner post 364 as in G Fix the plain end vertical...

Страница 10: ...T U R O S Q P 9 1 x Extra bolt 3 x Extra bolts 1 x Extra bolt 3 x Extra bolts...

Страница 11: ...bar 346 so that the stiffener is the correct way up Slide 4 bolts into vertical bar 359 to attach horizontal bar 329 and later the door jamb 757 The door lock if required can only be fitted on the INS...

Страница 12: ...Plumbline Spirit Level Tanalised timber batten V Y AA BB Z W CC 11...

Страница 13: ...op a plumbline from the top of the greenhouse to make sure that the ends are perfectly vertical and parallel to the plumbline Lightly secure it with a masonry pin not supplied driven halfway through o...

Страница 14: ...Spoon Door Bottom Bar Slider 478 Bottom Horizontal Door Bar N B Build the door before glazing DD EE FF GG VIEWED FROM INSIDE HH EXTERNAL VIEW INTERNAL VIEW GLASS 13 989 987 OUTSIDE...

Страница 15: ...vertical door bars side by side to match the holes Before fitting the intermediate door bar 986 check which side the door pull should be on depending on whether your door is on the left side or right...

Страница 16: ...ing off excess with a clean dry cloth To achieve a good seal all surfaces must be clean dry and free from oil which can be achieved by using white spirit Place the other end of the glass onto the midd...

Страница 17: ...l with the top of the glass with a hack saw Then re fit the door wheel housing Slide door seal 984 into both vertical door bars as in II and crimp bottom end of door bars with pliers to prevent seal s...

Страница 18: ...OO BF RR PP INSIDE OUTSIDE OUTSIDE INSIDE 17...

Страница 19: ...ote that the door lock is fitted on the INSIDE of the greenhouse so you may not need it Fit door lock 976 to door jamb 757 with the two screws 997 through the holes provided in the door jamb as in PP...

Страница 20: ...TOP TOP TOP TOP Gasket Flat wooden stick Push SS XX 9 8 1 VV Completed vent from inside Completed vent from outside YY WW 19 OUTSIDE TOP OF 913...

Страница 21: ...er joint to seal join in gasket Assemble the corners of the frame by means of the four self tapping screws 401 as in XX and YY straightening the bars if bowed Check the diagonal measurements for squar...

Страница 22: ...38 D 610 x 540 1 1 1 E 610 x 399 1 1 1 P 610 x 200 1 1 1 G 610 x 308 1 1 1 H 610 x 507 1 1 1 J 610 x 556 3mm Acrylic 2 2 2 K 610 x 610 2mm Acrylic 4 5 6 L 610 x 508 7 8 10 R 610 x 467 1 2 2 TOTAL 56 6...

Страница 23: ...clips 453 as in AF AL As an extra precaution run a thin bead of silicon sealant along the top outside edge of each H section already in position immediately wiping off excess as before Fit another H...

Страница 24: ...he glass with the seal ensuring cut in seals fits over the corner of the glass as in C Fit left and right roof vent bars over the glass and fix corners to roof vent bottom bar using self tapping screw...

Страница 25: ...mer Service Department Eden Halls Greenhouses Ltd The Distribution Centre Stoke Orchard Nr Cheltenham Glos GL52 7RS Tel 01242 676625 mail eden greenhouses com WE RESERVE THE RIGHT TO DISALLOW CLAIMS F...

Отзывы: