4. Door Gable End
Lay out the coded parts as before and bolt them together loosely using short bolts (
400
) in
the same order as the plain gable end, except that the door track (
974
) should be fitted
BEFORE the vertical bar (
346
) as in
T
,
S
and
U
.
Slide 2 bolts into (
346
) to attach the horizontal (
329
) and vertical stiffener (
758
) as in
O
.
Match holes in stiffener
(758)
with holes in vertical wall bar
(346)
so that the stiffener is
the correct way up.
Slide 4 bolts
into vertical bar (
359
) to attach horizontal bar (
329
) and later the door
jamb (
757
).
The door lock, if required, can only be fitted on the INSIDE of the greenhouse.
Note that the diagonal strut (
363
) is fixed to the sill bar (
750
) with the same bolt as the
vertical bars as in
P
and fix the other end as in
Q
.
Loosely fit a nut and bolt into the middle of the door track and then slide small vertical bar
(
360
) over the bolt head and tighten as in
S
.
Fix the other end of the vertical bar to the gable end in the same way as in
R
.
10
Содержание Silverline 106 Lean-To
Страница 3: ...1106 No 6 x 16mm self tapping screws 1476 612 1774 5 1839 2...
Страница 4: ...1633 PLEASE NOTE PART 00649 IS A REDUNDANT ITEM THAT IS NO LONGER REQUIRED 3...
Страница 6: ...PLEASE NOTE THE GREENHOUSE MAY BE SUPPLIED WITH EITHER SQUARE NUTS OR HEXAGONAL NUTS A B C E D 5...
Страница 8: ...M J H G I K N F L F 7...
Страница 10: ...T U R O S Q P 9 1 x Extra bolt 3 x Extra bolts 1 x Extra bolt 3 x Extra bolts...
Страница 12: ...Plumbline Spirit Level Tanalised timber batten V Y AA BB Z W CC 11...
Страница 18: ...OO BF RR PP INSIDE OUTSIDE OUTSIDE INSIDE 17...