All bases, of any material must be level and square and built of the exact outside measure-
ments.
If you are putting a concrete footing down it is wise to dig a trench around the perimeter removing
all top soil, insert some hard-core (broken brick etc.) into the trench and back fill with concrete.
You can now begin to lay the required course of brick, remembering to insert a damp-proof strip
one or two courses above ground level.
ELITE GREENHOUSES BASE DIMENSIONS
For Brick, Block, Concrete or Timber
The standard greenhouse is supplied with flat cills enabling it to be fixed to any level surface
without the need for a brick base.
The dimensions given on the previous page must be used to locate the position of your lean-to onto
a flat concrete floor.
When placing your order, you should have decided upon the door position.
For the purposes of this
plan, we have made the left hand gable the door end, but it can just as easily be the right hand end,
so please read the instructions with the alternative in mind.
(Key point).
ALLOY BASE ASSEMBLY
If you have ordered a separate alloy base then follow this instruction, if not disregard this
step.
Содержание TITAN K800
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 17: ...GENERALASSEMBLY OF GREENHOUSE UNIT...
Страница 24: ...DOOR FRAME ASSEMBLY...
Страница 36: ...ELITE 1512...