There are a number of small angle brackets in the pack of fittings; these are to be bolted onto the
upright glazing bars at the point where the cills are attached to them. Before bolting them to the
frame, first mark the brickwork where the holes are to be drilled. Drill the holes with a masonry bit
and insert the plastic plug. Secure the small angle to the uprights and screw through the hole in the
angle into the plug as illustrated.
The structure is now ready for the final sealant. There is a tube of silicon and a skeleton gun in the
pack which you can now use to seal between the wall bars and ridge and the brick wall.
Содержание TITAN K800
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 17: ...GENERALASSEMBLY OF GREENHOUSE UNIT...
Страница 24: ...DOOR FRAME ASSEMBLY...
Страница 36: ...ELITE 1512...