FRONT FRAME ASSEMBLY
From the main box and subsidiary extension packages you will require:
1 Eave/gutter bar
1 Cill – Taped together in one bundle marked FRONT (the ridge is also in this pack)
1 Heavy angle brace
1 Pack of glazing bars marked FRONT
i) if unit is 6’ long = 2 bars
ii)
8’ long = 3 bars
iii)
10’ long = 4 bars
iv)
12’ long = 5 bars
2 – bracing angles
N.B.
If you have ordered a partition, you need to decide where it will be situated. At that point you
substitute a partition corner bar for a glazing bar. The heavy angle brace needs to be cut to go either
side of the partition corner bar. If your building is over 20’ you will have an extension package
which has an inclusive partition – not the same as the above detail.
The partition corner bars have vertical saw cuts at each end to allow them to fit on and into the gut-
ter, ridge and cill pieces.
Содержание TITAN K800
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 17: ...GENERALASSEMBLY OF GREENHOUSE UNIT...
Страница 24: ...DOOR FRAME ASSEMBLY...
Страница 36: ...ELITE 1512...