background image

PARTITION 

 

If you have purchased a partition it is at this point you construct the frame in situ. In the box you 
will find packs marked 
Partition corner bars 
Partition door end cill 
Partition door end                                           
Partition door tracks 
Partition door panels 
Partition door posts 
You will also require a number of fittings from the box: 
1 gusset plate 
Glazing beading 
Nuts and bolts 
 

PROCEDURE 

 
1. Starting with the corner bars, identify the roof and side, left and right hands as you did earlier. 
 
2. Each corner bar has a saw cut approx. 20mm into the bar from each 
end, but apart from that they are identical. Insert the glazing beading as 
before – but this time into all 3 grooves of the corner bar. 

(Key point).

 

 
3. Having established where the partition is going you will need to 
make the holes in the gutter, ridge and cill into slots. Do this by careful-
ly hack sawing down into the hole to form the slot. 

(Key point). 

 
4. If the doors on your partition are to face the rear end, then the bolt channels on the roof and side 
corner bars must face the front door. (For partition doors facing front door, the bolt channels of the 
corner bar must face the rear end.  
 
5. Take the side corner bar, insert 1 bolt into each end of the alternative bolt slots, then offer it up 
to the eave/gutter and cill so that the flange of the cill and the eave are inserted into the saw cut. 

(Key point). 

Loosen the bolts just inserted and lower into the slot on the gutter and bottom cill and 

finger tip tighten. 
 
6. Repeat for the roof corner bars, but insert 6 bolts into the alternative bolt channel. 1 each end 
and 4 in the middle to attach to the top hat sections. 
 
7. Next, offer the gusset plate to the corner bars at the point where they meet. Slide the bolts in the 
facing bolt slot towards the gusset plates and line up the holes in the gusset plate with the bolts in 
the facing bolt slot and in the flange of the corner bar. Insert 2 bolts through the gusset plate and 
flange (middle 2 holes), put a nut on – finger tip tight. Do not put the nuts on the upper and third 
bolts of the eave gusset plates at this stage. 

(Key point). 

 
8. The cill can now be attached to the facing bolt slot of the partition corner bar (in the same way 
you did during the original door end assembly).  
 
9. You can now attach the two vertical glazing bars and wall bar. Thread the glazing beading into 
the channels and trim to suit. Follow instructions earlier in the plan related to building a gable with 
doors. 
For both double and partition-door ends you can now fit the upper door track. 

Содержание TITAN K800

Страница 1: ......

Страница 2: ......

Страница 3: ......

Страница 4: ...1 1 1 1 1 1 1 20 Door end wall bar 1 1 1 1 1 1 1 1 21 Door glazing bars handed unhanded 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 Front glazing bars marked front 2 3 4 5 6 7 8 9 23 Front diagonal angles 2 2...

Страница 5: ...purpose of coloured models There may be some jig holes in some bars these holes play no part in the assembly but assist in the painting process Extra care must be taken in assembly of all coloured mod...

Страница 6: ...LIES The building is divided into a number of different frame assemblies 1 Right hand gable end frame 2 Shelf installation 3 Left hand gable end frame 4 Front frame assembly 5 Roof assembly 6 Double d...

Страница 7: ...ick Block Concrete or Timber The standard greenhouse is supplied with flat cills enabling it to be fixed to any level surface without the need for a brick base The dimensions given on the previous pag...

Страница 8: ...e end section with the alternative in mind From the main box you require 1 Set of corner bars marked RIGHT END CORNER BARS Set of glazing bars angle and cill marked END This contains A Wall bar B Bott...

Страница 9: ...mitred at one end only Having determined which corner bar is the roof and side you must now establish which way round they go for assembly purposes c Side corner bar The end that is mitred and with o...

Страница 10: ...e of the roof corner bar Put a nut on the bolt and leave loose The diagram of the gusset plate on page 8 will assist in the construction 10 Attach the bottom cill to the side corner bar using the prev...

Страница 11: ...e 15 This gable end is almost complete Before tightening all nuts you must ensure the following a The corner joint behind the eave gusset plate is tight i e Corner bars are touching behind the gusset...

Страница 12: ...acket in the diagram Attach the angle supports to the angle brackets with the square edge against the greenhouse wall chamfered edge sticking out The angle support must be fitted to the slot closest t...

Страница 13: ...please read this section and the preceding one with the alternative in mind From the main box you will require 1 Set of corner bars marked LEFT HAND END CORNER BARS 2 Set of glazing bars angle and ci...

Страница 14: ...sons we suggest that you attach them the same way as horizontal bracing angle Using the previously inserted bolts attach the short bracing angle to the unit as shown exact distances are not required P...

Страница 15: ...5 bars 2 bracing angles N B If you have ordered a partition you need to decide where it will be situated At that point you substitute a partition corner bar for a glazing bar The heavy angle brace ne...

Страница 16: ...door 4 For double doors do not fit a glazing bar in the centre of the door way i e vertical bar No 2 on the picture is not supplied or fitted 5 Attach the gutter eave bar to the top of each glazing b...

Страница 17: ...GENERALASSEMBLY OF GREENHOUSE UNIT...

Страница 18: ...the corner 2 The bottom cill attaches to the inside of the corner bar The bolt placed in the bolt slot at gable end assembly will slide down into the slotted hole at the end of the cill 3 Do the same...

Страница 19: ...icated hole in the ridge bar 3 Then repeat at the bottom of each roof glazing bar and attach to the gutter bar 4 Attach all the other glazing bars to the gutter and ridge in the exact same way as abov...

Страница 20: ...of the ridge at the end of the vent top rail This can be done later when sealing the frame to the wall see page 22 1 On all models there are 2 top hat roof sections that are fitted along the length o...

Страница 21: ...the wall through the holes in the wall bar and ridge Then remove the structure to another location and drill through into the wall at the pre marked locations with a masonry drill Insert the plastic p...

Страница 22: ...ark the brickwork where the holes are to be drilled Drill the holes with a masonry bit and insert the plastic plug Secure the small angle to the uprights and screw through the hole in the angle into t...

Страница 23: ...ttom and the hooked hinge uppermost 3 Slide the glazing beading into the slots in the side and top rails and trim to suit 4 Insert a bolt into each end of the side rail bolt slots put these bolts thro...

Страница 24: ...DOOR FRAME ASSEMBLY...

Страница 25: ...g downwards Unhanded door post on the left handed door post on the right The top of each side post has two screw holes in it the bottom has three Key point Slide the glazing beading into the groove of...

Страница 26: ...is may already have been done pr ior to delivery After fitting the doors see later in the booklet you may need to lower the door skid so that it engages with the bottom door cill to allow smooth movem...

Страница 27: ...OWNWARDS like a letter n Key Point 2 Having decided where the door is positioned install the door track support at the door opening bay utilising the unoccupied bolts in the glazing bars Fit the door...

Страница 28: ...nside of the structure with the angle jambs fitting around the glazing bar N B The handle is on the inside of the greenhouse and the right hand side as viewed from inside the struc ture 4 To determine...

Страница 29: ...rner bar insert 1 bolt into each end of the alternative bolt slots then offer it up to the eave gutter and cill so that the flange of the cill and the eave are inserted into the saw cut Key point Loos...

Страница 30: ...ix 2 angle brackets to the door end as sembly Insert a cropped head bolt into the bolt channel at the top of the left hand glazing bar viewed from the inside and fix and angle bracket as shown in the...

Страница 31: ...ediately behind the door i e the section of glass that the door opens on to NB If you have purchased PVC bar capping the stainless steel band clips are replaced by wire clips See separate instruction...

Страница 32: ...ed Roof vent Wire clips must be used on the panes of glass either side of the vent The wire clips are only neces sary on the sides of the glass nearest to the vent This is because the vent side rails...

Страница 33: ...NED GLASS PLAN WITH DOUBLE GABLE DOORS T8 610 X 457 T9 610 X 610 T12 585 X 1197 T14 640 X 610 T17 545 X 100 T26 598 X 2602 T27 585 X 2602 T28 585 X 2003 T29 610 X 1930 T30 598 X 1930 T31 585 X 1930 T3...

Страница 34: ...s and quantities of glass will vary according to greenhouse size door position and acces sories added A glazing plan for your greenhouse specification will be attached to your delivery note T8 610 X 4...

Страница 35: ...8 turn upwards to lock the door in place 5 Maintenance with an alloy greenhouse is minimal but ensure that the door top and bottom tracks are free from debris which will inhibit its movement The louv...

Страница 36: ...ELITE 1512...

Отзывы: