HELPFUL HINTS
Please do take your time and be sure to read all instructions carefully before assembling.
Consider purchasing the Elite Construction pack to help with the installation – contact dealer
for details.
Do not assemble frame in high winds.
The greenhouse frame should be anchored to a permanent foundation. This will not only help
secure it against powerful winds but will help prevent breakage of the glass caused by the freezing
and thawing process of the earth.
When building your own brick/concrete foundations ensure that they are level and square oth-
erwise your frame will not be correct and the glass will not fit.
Be sure all four corners of the constructed greenhouse are square before installing glass, and
do not install the glass until the greenhouse is on a permanent foundation.
Do not place your greenhouse in vulnerable locations such as under trees, playing areas, etc.
Children should not play near glass greenhouses.
REMEMBER: glass is fragile, handle with care!
Protective eye glasses should be worn.
Gloves should be worn.
If your greenhouse is a powder coated one there are a few 1/8” holes in the end of the bars.
These are jig holes for the process and have no bearing on construction.
(Key point).
When Powder Coated, the sub-frame assembly packages may slightly differ from the standard
alloy finish.
Powder coated packages are wrapped in polythene tubing – please be careful when opening
e.g. Do not run a knife down the sides as you can scratch the paintwork.
WHEN CONSTRUCTING A POWDER COATED MODEL PLEASE TAKE CARE
NOT TO DAMAGE THE FINISH BY WORKING ON CONCRETE OR PATIOS.
N.B. This plan covers the entire High Eave range. The only difference between a 6ft
long and an 8ft long for example are a few extra pieces of alloy, glass, nuts and bolts etc. The
construction of the sub-frame assemblies is the same but for the purposes of this booklet we
have used the 8 x 6 model as the benchmark. Therefore only one plan is needed.
We reserve the right to alter and improve our products.
Содержание 6'3" WIDE HIGH EAVE
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 11: ...REAR END ASSEMBLY ...
Страница 20: ...ASSEMBLY OF GREENHOUSE UNIT ...
Страница 32: ...ELITE 1407 ...