7.
Check that all angles between the built in base and the vertical members are at right angles
and that the glazing bars are right into the angle cill at the bottom.
(Key point).
8.
Tighten all nuts.
9.
Slide a bolt into the bolt slot in the built in base section, one at each end.
The corner bracket
is approx 400mm long and has 6 holes (4 at 1 end and 2 at the other). Attach the corner
bracket (base anchors) so that it is pointing downwards by using the end of the bracket
that has 2 holes (not 4) to the bolt channel of the base section. If you are fitting your
greenhouse onto soft ground, then do not fit the corner bracket yet. If you are on a pa-
tio, you will need to cut the bracket off level with the bottom of the built in base and
slide extra bolts into the bolt channel to be attached to the angle brackets (generally 1
every 2’). If you are on soil, the bracket will go into the ground at general assembly.
(Key point).
N.B. Roof Corner Bars are marked “R” on the outside, which indicates that they meet at the ridge.
They are also mitred at both ends.
If you have a powder coated greenhouse there is no letter “R” on the corner bar. You
must
ensure
that the “middle” hole is nearer to the ridge plate than the eaves plate.
(Key point).
Содержание 6'3" WIDE HIGH EAVE
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 11: ...REAR END ASSEMBLY ...
Страница 20: ...ASSEMBLY OF GREENHOUSE UNIT ...
Страница 32: ...ELITE 1407 ...