ROOF VENT ASSEMBLY
The roof vent pack has 5 pieces of aluminium: and from the main box of fittings you require:
6’ of glazing beading
4 nuts and bolts
2 casement stay pins
1 casement stay
6 M4 stainless steel nuts and bolts.
PROCEDURE:
1.
Identify the slam bar and attach the 2 stay pins to the outer side of the angle using the M4
stainless steel nuts and bolts.
2.
Lay the 4 edge pieces of the vent on a level surface as though you were on the inside of the
vent (with the bolt slots of the side bars uppermost and the ‘v’ slots of the bottom rail upper
most. The top rail is arranged in such a way that the squared off end is to the bottom and the
hooked hinge uppermost).
3.
Slide the glazing beading into the beading groove in the side and top rails and trim to suit.
4.
Insert a bolt into each end of the side rail bolt slots, put these bolts through the holes in the
top and bottom rails, add nuts and lightly tighten. Check that all joints are secure and that the
vent is square, and then tighten up the nuts.
5.
Fit the casement stay using the M4 stainless steel nuts and bolts, putting the bolts through
the holes in the saddle of the stay through the 2 elongated holes in the bottom rail. Hold the nuts
in place and tighten the bolts with a screwdriver.
Do the same with the other vents.
Содержание 6'3" WIDE HIGH EAVE
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 11: ...REAR END ASSEMBLY ...
Страница 20: ...ASSEMBLY OF GREENHOUSE UNIT ...
Страница 32: ...ELITE 1407 ...