PURELAB Ultra Mk2
Operator Manual
ELGA
Page 24
PURELAB Ultra Mk 2 Version 3 11/08
5.6 Initial Start Up
Step 1 - Prepare Water Supply
1. The
PURELAB Ultra
should be installed correctly as
described in Section 5.3.
2. TURN ON the feedwater supply to the unit and adjust
the inlet pressure.
3. CHECK all tube connections are watertight and that
there are no leaks.
Step 2 - Prepare Sanitization By-pass Blocks
1. OPEN front door.
2. CHECK by-pass blocks are correctly located and locked
in place.
3. CLOSE
door.
CAUTION!
Unit contains 1% peroxide solution which
must be flushed to drain.
Step 3 - Initial Rinse
1. SWITCH ON electrical supply.
The
PURELAB Ultra
will automatically go into a rinse
procedure (36 mins) to rinse bacteriostatic agents from
the unit. This rinse must be completed; the process
function will be inhibited until the rinse is complete.
2. Upon completion of the rinse the unit will bleep twice.
Step 4 - Remove Sanitization By-pass Blocks
1. SWITCH OFF power.
2. OPEN the door.
3. REMOVE both by-pass blocks and pour contents away.
4. STORE by-pass blocks on hangers inside the door.
CAUTION
Before installing the purification packs,
ensure the correct date has been set as
described in Section 5.4 step 4 - Date.
Failure to enter the correct date may result
in premature replacement of the
Purification Packs.
Step 5 - Fit Primary Purification Pack
1. REMOVE a new Purification Pack from its packaging.
2. REMOVE the sealing plugs from inlet and outlet ports.
3. WET ‘O’ rings and SLIDE new Purification Pack into the
left hand position pushing upwards against pack reader
contacts.
4. POSITION
Purification Pack onto spigots.
5. PUSH into unit.
6. ENSURE that the Purification Pack is fully engaged and
dropped down past the retainers.
Initial Rinse Screen
Primary
Polishing
purification
purification
pack
pack
Location of Purification Packs
By-pass blocks
By-pass block hangers
Location of By-pass Blocks