PURELAB Ultra Mk2
Operator Manual
ELGA
Page 16
PURELAB Ultra Mk 2 Version 3 11/08
Step 4 - Connect Electrical Supply
1. PLUG mains power lead into the mains power socket
on the left hand side of the
PURELAB Ultra
unit.
2. PLUG mains power lead into mains socket.
Step 5 - Resevoir Level Connection
1. INSERT jack plugs into the level control socket located
at rear of unit and reservoir.
Note:
If wall mounting the unit it is recommended
that the jack plug should be inserted prior to
locating the unit on the wall mounting bracket.
Fuse
ON/OFF
switch
Mains power lead
Mains power socket
Electrical Connections
Reservoir
RS232
level
connection
Reservoir Level Connection
Level
control
Содержание PURELAB Ultra Mk 2 Scientific
Страница 4: ......