![Electro Industries Shark 100S Скачать руководство пользователя страница 145](http://html.mh-extra.com/html/electro-industries/shark-100s/shark-100s_installation-and-operation-manual_2379713145.webp)
Doc
#
E145721
D - 3
D: DNP 3.0 Protocol Assignments
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Shark® 100S meters' addresses are programmable from 0 - 247 (0x0000 - 0x00F7),
and address 65535 (0xFFFF) is recognized as the all stations address.
D.3: Transport Layer
The Transport Layer as implemented on Shark® 100S meters is subject to the
following considerations:
Transport Header
Multiple-frame messages are not allowed for Shark® 100S meters. Each Transport
Header should indicate it is both the first frame (FIR = 1) as well as the final frame
(FIN = 1).
D.4: Application Layer
The Application Layer contains a header (Request or Response Header, depending on
direction) and data.
Application Headers
Application Headers contain the Application Control Field and the Function Code.
Application Control Field
Multiple-fragment messages are not allowed for Shark® 100S meters. Each
Application Header should indicate it is both the first fragment (FIR = 1) as well as the
final fragment (FIN = 1). Application-Level confirmation is not used by Shark® 100S
meters.
Function Codes
The following Function codes are implemented on Shark® 100S meters.
Read (Function 1)
Objects supporting the READ function are:
• Binary Outputs (Object 10)
• Counters (Object 20)
• Analog Inputs (Object 30)
Содержание Shark 100S
Страница 1: ...S h a r k 100S ...
Страница 2: ...This page intentionally left blank ...