Installation
Pedestal
1 Hole for pipes
4 Hole for the condensate drain pipe
1 load-bearing base.
2 antifreeze ( compacted crushed stone , eg 0 to 32/56 mm ) layer thickness
to local requirements and the rules of construction engineering .
3 gravel for seepage of condensate
4 drainpipe , for example, KG DN 40
5 pipeline
6 wall opening ( core hole ) D 250 mm
Creation of the load-bearing base
for the heat pump AEROTOP G
• Set the heat pump in vertical on a
solid surface
• Note: concrete foundation with a
thickness of 15-
20 cm;
the dimensions are shown in figu-
res.
•
The layer thicknesses are average
values and have to be adapted to
local conditions.
•
The rules of construction enginee-
ring must be observed.
•
For pipes that must be included
under the heat pump (pipeline,
electrical cables, condensate
drain), it is necessary to provide
an appropriately dimensioned
recess in the foundation (see the
project of load-bearing base)
Note: On snowy places (with snow
height > 30 cm usual) is recommen-
ded to adjust the plinth height (height
=approx. usual snow depth - 15 cm).
Between the building and the heat
pump it is necessary to lay the pipeli-
ne pre-assembled with a length ac-
cording to the calculations
For the installation , the pipeline must
protrude about 30 cm height of the
foundation .
6
0
0
180
25
Содержание AEROTOP G
Страница 28: ...Installation Delivery to installation site 2 3 1 n 17 4x 8x M10 4x 4x 28...
Страница 29: ...Installation Delivery to installation site 29...
Страница 31: ...Installation Hydraulic connections assembly instructions 3 1 n 3 1 4 2x n 46 1 x 2 1 4 10 x 31...
Страница 32: ...Installation Hydraulic connections assembly instructions 4 7 5 8 4x 1 4 6 2 x 32...
Страница 36: ...Installation Instruction for the installation of control unit black wire CL 5 4 36...
Страница 57: ...Notes 57...
Страница 58: ...Service www elco net...