UNPACKING THE APPLIANCE
Stand the carton right way up, cut the strapping bands and remove the top end cap. Read all the
instructions before continuing to unpack or install this appliance.
Remove the box containing the fire front, and the bags and boxes containing the ceramic parts.
Remove the cardboard packing pieces, and any bags containing other fittings or parts. When all
loose parts have been removed, the outer sleeve may be lifted off to reveal the appliance. Check
that the components supplied correlate with the checklist given in section 7.1. Please dispose of
the packaging materials at your local recycling centre.
COMPONENT CHECKLIST
QUANTITY
DESCRIPTION
1
Firebox and burner tray assembly.
1
Decorative frame, one of several finishes.
1
Fire front with separate ashpan cover, one of several designs and finishes.
1
Moulded ceramic fibre combustion matrix.
22
Individual ceramic coals (coal effect option only)
22
Individual ceramic pebbles (pebble effect option only)
2
Moulded ceramic front coal strip (coal effect option only)
2
Moulded ceramic front strip (pebble effect option only)
3
Ceramic radiant panels.
1
Set of manufacturers instructions and warranty card.
1
Cable fixing kit comprising; 2 cables, 2 tensioners, 2 clamps, 4 fixing eyes, 4 fibre rawl plugs.
2
Ceramic brick panel retaining clips
1
Remote control handset (remote control option only)
1
Pack of batteries (1 x ‘PP3’, 4 x ‘AA’) (remote control option only)
1
Self tapping screw pack
3
Lengths of self adhesive sealing strip.
1
Rubber grommet.
PREPARING THE APPLIANCE
Note: Ensure that the gas supply is isolated
before commencing installation of the appli-
ance.
The fireplace opening and environment must be
in compliance with the specifications laid down
in the appropriate sections of these instructions.
Remove the appliance from it’s carton as
described previously and stand upon a dust
sheet or similar. Place the decorative frame, fire-
front, ceramics and fixings safely to one side.
Remove the burner from the assembly by
releasing the two screws through the tray legs.
The tray is now free, and may be lifted away.
The three radiant panels may now be fixed inside the firebox. Select the
textured side of each panel and insert as follows; Lay the firebox on it’s
back. Lay the large rectangular panel onto the rear face of the firebox. The side panels should be
fitted by inserting their front edges into the pre-fitted retaining brackets on the front face of the
firebox. Gently align the side panels with the side of the firebox, over the top of the back panel
already in place. Make sure that the side panels are pushed
up
firmly to the roof of the firebox,
and
back
firmly to retain the back panel. Make small adjustments to line up the mortar lines if
required (brick patterned pads only). Secure the side panels using the small ‘Z’ shaped brackets
and screws provided. The screws should locate into the pre-punched holes in the sides of the fire-
box.
5
7.0
7.1
8.0
©
2009 Focal Point Fires plc.