FUEL BED LAYOUT - continued
5. Finally, take the six remaining pebbles and
place at the back of the fuel matrix as shown.
Once again, the pebbles may be orientated as
desired in order to give a realistic effect. Avoid
pushing the pebbles down between the sup-
ports. The fuel bed layout is now complete.
The fire is designed to operate correctly with the pebbles supplied when assembled according to
the instructions. Never add to the twenty-two pebbles, or change them for a different type. Never
throw rubbish or other matter onto the fuel bed.
Due to the light colour of the pebbles, some discolouration/sooting is to be expected during nor-
mal use.
INSTALLING THE BATTERIES (remote control versions only)
Handset - Remove cover from rear of handset and insert 1 x ‘PP3’ (9 volt) battery - Replace cover
Appliance -
Ensure appliance is off and cool
. Remove cover from top of receiver box. The cover
is protected by reflective foil, and located towards the right hand side, underneath the burner
unit. Insert 4 x ‘AA’ (1.5 volt) batteries - Replace cover.
FITTING THE DECORATIVE FRAME AND FRONT
The appliance is supplied with a decorative frame in a variety of
finishes. The frame is of three-piece design and is held onto the
firebox by magnets
Firstly attach two magnets (one at the top and one at the bot-
tom) to each side piece and then attach to the sides of the fire-
box frame. Attach the remaining two magnets to the top piece
and position on the top of the firebox frame ensuring the cor-
ners meet neatly.
IMPORTANT : Due to the possibility of sharp edges, care
should be taken when handling the three-piece frame com-
ponents. The use of protective gloves is recommended.
Place the decorative firefront in front of the fire and slide the
ashpan door into place. The firefront shown in these instructions may be different to the one sup-
plied with the appliance.
Eko 2020 models :
The firefront is retained in position on the firebox by two bracket as shown.
Position the firefront so the holes in the retaining brackets line up with the M6 inserts in the fire-
box. Secure the front in position using the two M6 screws provided.
TESTING AND COMMISSIONING
Turn on and test the gas supply up to the fire for any leaks, in accordance with current edition of
BS6891.
When the appliance is first used, protective oils coating the firebox may burn off. It is advisable
to ventilate the room during this period for at least one hour.
11
13.0
12.1
14.0
12.2
Eko 2020 Front location
©
2009 Focal Point Fires plc.