PV Blocks system
Page 39
When the scheduler is paused, no measurements are taken anymore. This is made
clear by the red warning area on top of the screen.
Pressing the Reset Scheduler button will make sure all PVBlocks are configured cor-
rectly. Always do this when changes in hardware have been made (adding or removing
physical PVBlocks).
IV-curves
Each connected load (IV-MPP PVBlock) can be programmed to take IV-curves at regu-
lar intervals. After resetting the scheduler no IV-curves will be measured.
Press the green edit icon behind the load that you want to configure.
A new page opens:
Содержание PV Blocks MP-1000S
Страница 1: ...PV Blocks PV Evaluation system Instruction Manual Powered by ReRa Solutions...
Страница 11: ...PV Blocks system Page 11 Figure 1 1 PV Blocks configuration...
Страница 13: ...PV Blocks system Page 13 Figure 1 3 12V power block...
Страница 35: ...PV Blocks system Page 35 Press the New button to create a new PV Module...
Страница 51: ...PV Blocks system Page 51...
Страница 59: ...PV Blocks system Page 59 Connect connector2 4 cables white grey green red to position 5 8 of PV IV MPP Block...