PV Blocks system
Page 38
As a default the system measures the values at a one-minute interval. This means all
temperatures, irradiances, meteo-data and the current/voltage pair of each PV-Module
are stored.
It is not possible to change this interval.
When something changes in the PVBlocks configuration, for example a new PVBlock is
added, the scheduler needs to be updated.
For any change in the Scheduler (and in the hardware) it is required to pause the sched-
uler. Press the
Pause scheduler
button:
Содержание PV Blocks MP-1000S
Страница 1: ...PV Blocks PV Evaluation system Instruction Manual Powered by ReRa Solutions...
Страница 11: ...PV Blocks system Page 11 Figure 1 1 PV Blocks configuration...
Страница 13: ...PV Blocks system Page 13 Figure 1 3 12V power block...
Страница 35: ...PV Blocks system Page 35 Press the New button to create a new PV Module...
Страница 51: ...PV Blocks system Page 51...
Страница 59: ...PV Blocks system Page 59 Connect connector2 4 cables white grey green red to position 5 8 of PV IV MPP Block...