44
On the
”Graph"
tab
menu,
select
the
measurement
date
first. Click
the
drop
arrow
on
the
right
side
of the date indication
will display the calendar.
When changing the years, move the mouse cursor on the top of the year indicator and left
click. The drop arrow appears; click the up/down arrow to change the years.
To change the month, move the mouse on the month indicator; dropdown menu will
appear by left clicking. Either select the month or click the left/right arrow keys will
display the monthly calendar. Then click the desired date on the calendar.
Once the year, month, and date are selected, the list of data which was taken for that day
is displayed in timely order. Click the date of data to be graphed, the row is indicated as
selected. Click “Graph” button in this condition will display the graph.
Also, the data can be graphed for the days assigned on the right side of the calendar
indicator “1 Day”.
B)
Graph Indication
There are 7 types of graphing on the Graph tab.
a.
I-V Curve (Measured Value)
b.
P-V Curve (Measured Value)
c.
I-V Curve (Converted)
d.
P-V Curve (Converted)
e.
V-T Curve (Measured Value)
f.
I-T Curve (Measured Value)
g.
Differential Curve (dI/dV-V Curve)
Check the items to be graphed and click “Graph” to display the graphs.
Graph Colors
By clicking the “Graph Color Setting” button on the right side of the each graph data item,
the “Color Setting” dialog box will appear. Click on the color that you want to use and
click “OK”; the color of the graph will change as assigned.
Содержание MP-170
Страница 5: ...4...
Страница 55: ...54 http www eko co jp...