6.4.2
Configuration of the EPO-port
Conductor
function
Size of connecting wire
EPO
0,5-1 mm
2
Leave the EPO-plug installed on the EPO-port of the UPS even if the EPO-
function is not needed.
Fig. 6-2
EPO-plug
Please see the information regarding the connection of the EPO-contact in
chapter 3.3.3 EPO-port.