
UPS Adira (6kVA, 6kVA XL, 10kVA,
10kVA XL 1-phase)
Storage and Unpacking
Adira series
37
Fig. 4-4
Unpacking
– step 4
The shipping materials are recyclable. After unpacking, save them for later use
or dispose of them appropriately.
Inspect the appearance of the UPS to see if there was any damage in-
curred during transportation. Do not turn on the unit and notify the carrier
and dealer immediately if there is any damage or if any parts a missing.
Содержание ABADX120009XX600
Страница 83: ...UPS Adira 6kVA 6kVA XL 10kVA 10kVA XL 1 phase Conformity Declarations Adira series 83 Adira 6kVA XL...
Страница 84: ...UPS Adira 6kVA 6kVA XL 10kVA 10kVA XL 1 phase Scope of Delivery Optional Accessories Adira 10kVA...
Страница 85: ...UPS Adira 6kVA 6kVA XL 10kVA 10kVA XL 1 phase Conformity Declarations Adira series 85 Adira 10kVA XL...
Страница 86: ...UPS Adira 6kVA 6kVA XL 10kVA 10kVA XL 1 phase Notes...
Страница 87: ...UPS Adira 6kVA 6kVA XL 10kVA 10kVA XL 1 phase Notes Adira series 87...