D13510840D - Calibrated leak - He 4-6
Page 61
First use or changing the type of gas
1. Close all valves and the vent screw.
2. Unscrew old test gas bottle.
3. Remove protective cap from new test gas bottle.
4. Screw in the new reservoir (hand tight) right up to the stop.
5. Open the test gas supply on the reservoir (the knob turns downwards). See
,
item 2.
The pressure gauge must now indicate the pressure of the gas bottle.
6. Close the blocking valve on the reservoir (the knob turns upwards).
Содержание ELD500 Series
Страница 9: ...D13510840D Contents Page vii...
Страница 10: ...This page has been intentionally left blank D13510840D Contents Page viii...
Страница 12: ...D13510840D Introduction Page 2 This page has been intentionally left blank...
Страница 38: ...D13510840D Page 28 This page has been intentionally left blank...
Страница 58: ...D13510840D SL Sniffer line Page 48 This page has been intentionally left blank...
Страница 64: ...D13510840D Partial flow adaptor Page 54 This page has been intentionally left blank...
Страница 78: ...D13510840D Calibrated leak He 4 6 Page 68 This page has been intentionally left blank...
Страница 84: ...D13510840D Calibrated leak screwed socket Page 74 This page has been intentionally left blank...
Страница 121: ......