![ECR International Dunkirk DCB-100 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/ecr-international/dunkirk-dcb-100/dunkirk-dcb-100_installation-operation-and-maintenance-manual_2356127007.webp)
3
TABLE OF CONTENTS
Verify Contents Received ...............................................2
Table Of Contents ..........................................................3
Physical Data.................................................................4
1 - Important Information .............................................6
2 - Introduction .............................................................7
2.3 Requirements For Commonwealth Of Massachusetts:
................................................................................7
2.4 Use Of Carbon Monoxide Monitor ............................7
2.5 Designated Use ....................................................7
2.6 The Unit Must Not:................................................7
2.7 Operational Features .............................................7
3 - Component Listing .................................................11
4 - Locating Boiler .......................................................14
4.1 Boiler Location Considerations .............................14
4.2 Clearances ........................................................15
4.3 Wall Mounting ....................................................16
5 - Combustion Air And Vent Piping .............................17
5.1 General .............................................................17
.........................................................17
5.3 Removal Of Existing Boiler From Common Vent
System ...................................................................18
5.4 Approved Venting Materials .................................19
5.5 Vent Termination ................................................19
5.6 Coaxial Venting Instructions .................................21
5.7 Coaxial Vent Screw Placement .............................22
5.8 Twin Pipe Systems ..............................................23
5.9 Twin Pipe Polypropylene Adapter Kit Installation .....24
5.10 Twin Pipe CPVC Adapter Kit Installation.................24
5.11 Twin Pipe Polypropylene Adapter Kit Installation
5.12 Twin Pipe CPVC Adapter Kit Installation...................25
5.13 Securing Twin Pipe Polypropylene Venting ......... 26
5.14 Flexible Vent System ........................................29
5.15 Condensate Piping ............................................31
6 - Hydronic Piping .........................................................32
6.1 General .............................................................32
6.2 Special Conditions ..............................................33
6.3 Safety Relief Valve And Air Vent ...........................33
6.4 Trim Piping .........................................................34
6.5 System Piping ....................................................34
6.6 External Optional Low Water Cut Off
6.7 Manufacturer Recommendation - Flter On DHW Inlet
..............................................................................37
6.8 Central Heating System .......................................38
6.9 Frost Protection Mode ..........................................38
6.10 Pump Protection ...............................................38
7 - Gas Supply Piping ..................................................39
7.1 General .............................................................39
7.2 Gas Pipe Recommendations .................................40
7.3 Leak Check Gas Piping ........................................42
........................................................42
8 - Electrical Connections ............................................43
8.1 General .............................................................43
8.2 Electrical Connections .........................................43
8.3 Access To Connection Block..................................44
8.4 Main Supply Connection ......................................44
8.5 Install Room Thermostat .....................................45
8.6 Optional Outdoor Air Sensor (OAS)........................45
8.7 Options For Indirect Water Heater Connections ..... 47
8.8 Use Of 0-10V Input To Control Boiler Water Temperature
.................................................................................47
9 - Start Up Procedure .................................................49
9.1 Central Heating System Connections - Central Heat
Models Only .............................................................49
9.2 Central Heating System Connections - Heating And
Domestic Hot Water Models .......................................50
9.3 System Start Up .................................................51
9.4 Fill Condensate Trap With Water ...........................51
9.5 Control Panel......................................................52
9.6 Prior To Commissioning: ......................................53
9.7 Commissioning For The First Time: .......................53
9.8 Automatic Calibration Function .............................53
9.9 Manual Calibration Function: ................................54
9.10 De-Aeration Function .........................................54
9.11 Changing The Type Of Gas ................................54
9.12 Chimney Sweep Function ..................................55
9.13 Combustion Adjustment Function (CO2%) ........ 55
9.14 Check Firing Rate ..............................................56
9.15 Parameter Settings ...........................................56
9.16 Description Of Parameters: Factory Settings ...... 57
9.17 Adjusting Maximum Heating Power .................. 59
10 - Operating Instructions .........................................60
10.1 Testing For Gas Leaks And Purging The Gas Supply
..............................................................................60
10.2 Boiler Operation ................................................60
10.3 Central Heating Mode ........................................60
10.4 Domestic Hot Water Mode ..................................60
10.5 Frost Protection ................................................61
10.6 Pump And Models Equipped With Three Way Valve
..............................................................................61
10.7 Low Water Pressure Sensor (Internal) ............ 61
11 - General Maintenance And Cleaning ......................62
11.1 Beginning Of Each Heating Season ......................62
11.2 Maintenance And Routine Servicing .................. 63
11.3 Component Replacement And Cleaning ............ 63
11.4 Draining The Boiler ...........................................64
11.5 Draining The Heating Circuit ...............................64
11.6 Hydraulic Unit (Dhw) .........................................65
11.7 Cleaning The Cold Water Filter ............................65
11.8 Final Commissioning After Annual Service ......... 65
11.9 Final Assembly .................................................65
11.10 User Information .............................................66
11.11 Safety Flue Thermostat . ....................................66
11.12 Flue Pressure Switch (125-150 Only) ............ 66
11.13 Replacement Parts ..........................................66
12 - Ratings And Capacities .........................................67
12.1 Ratings And Capacity.........................................67
12.2 Domestic Hot Water Specifications
12.3 High Altitude Ratings .........................................68
12.4 High Altitude Chart............................................68
13 - Trouble Shooting ..................................................70
13.1 Error Messages And Resetting The Boiler .......... 70
13.2 Anomalies Table For The Installer ........................72
14 - Glossary ...............................................................73
Appendix A - Wiring Diagrams ............................... 75-80
240013501 REV A [03/15/2022]
Содержание Dunkirk DCB-100
Страница 2: ...DCC 205...
Страница 4: ...DCB 165...
Страница 79: ...75 A 2 MODEL 75 100 Heat Only APPENDIX A WIRING DIAGRAMS 240013501 REV A 03 15 2022...
Страница 80: ...76 APPENDIX A WIRING DIAGRAMS A 2 MODEL 125 Heat Only 240013501 REV A 03 15 2022...
Страница 81: ...77 APPENDIX A WIRING DIAGRAMS A 3 MODEL 165 Heat Only 240013501 REV A 03 15 2022...
Страница 82: ...78 APPENDIX A WIRING DIAGRAMS A 1 MODEL 115 Combi 240013501 REV A 03 15 2022...
Страница 83: ...79 APPENDIX A WIRING DIAGRAMS A 4 MODEL 150 Combi 240013501 REV A 03 15 2022...
Страница 84: ...80 APPENDIX A WIRING DIAGRAMS A 5 MODEL 205 Combi 240013501 REV A 03 15 2022...
Страница 85: ...81 NOTES 240013501 REV A 03 15 2022...
Страница 86: ...82 NOTES 240013501 REV A 03 15 2022...
Страница 120: ...32 PN 240011430 REV Q 03 15 2022 CIRCULATOR CONNECTIONS WIRING DIAGRAM SINGLE ZONE CIRCULATOR WIRING USING ARGO AR822 II...
Страница 121: ...33 PN 240011430 REV Q 03 15 2022 75 100 HEAT ONLY WIRING DIAGRAM MODEL 75 100 HEAT ONLY...
Страница 122: ...34 PN 240011430 REV Q 03 15 2022 MODEL 125 HEAT ONLY 125 HEAT ONLY WIRING DIAGRAM...
Страница 123: ...35 PN 240011430 REV Q 03 15 2022 MODEL 165 HEAT ONLY 165 HEAT ONLY WIRING DIAGRAM...
Страница 124: ...36 PN 240011430 REV Q 03 15 2022 115 COMBI WIRING DIAGRAM MODEL 115 COMBI...
Страница 125: ...37 PN 240011430 REV Q 03 15 2022 MODEL 150 COMBI 150 COMBI WIRING DIAGRAM...
Страница 126: ...38 PN 240011430 REV Q 03 15 2022 MODEL 205 COMBI 205 COMBI WIRING DIAGRAM...
Страница 132: ...44 PN 240011430 REV Q 03 15 2022 LOW WATER CUTOFF DETAIL LOW WATER CUTOFF NO NO YES...
Страница 137: ...49 PN 240011430 REV Q 03 15 2022 3 FAULT SOLUTION SECTIONS...